- Streetsblog San Francisco - http://sf.streetsblog.org -
AC Transit: East Bay BRT Design Meetings, Second Round
Posted By Robert Prinz On November 2, 2012 @ 6:30 pm In Events | No Comments
From AC Transit [1]:
To meet neighborhood needs and ensure community compatibility, AC Transit is holding another round of workshops to gather input from local businesses and residents on the neighborhood-level design of the BRT stations.
The meetings will be held on:
Participants can provide input key project elements, including:
All input will be considered. The resulting project design features will be released in early 2013.
For more information, visit www.ACTransit.org, call 510-891-7175 or email brt@actransit.org.
Article printed from Streetsblog San Francisco: http://sf.streetsblog.org
URL to article: http://sf.streetsblog.org/2012/11/02/ac-transit-east-bay-brt-design-meetings-second-round/
URLs in this post:
[1] AC Transit: http://www.actransit.org/planning-focus/your-guide-to-bus-rapid-transit/
Click here to print.
Copyright © 2008 Streetsblog. All rights reserved.