SFMTA Engineering Hearing

Agenda [pdf]

On the agenda:

  • Establishing stop signs on Berry Street at De Haro Street, and on Monterey Boulevard at San Leandro Way
  • Revoking transit-only lane, 4th Street, between Harrison Street and Townsend Street

ALSO ON STREETSBLOG

SFMTA Hearing: Polk Street Redesign and More

|
Agenda Of note: Polk Street redesign, with bike lanes (protected and unprotected), bulb-outs, loading zones, Parking-protected bike lane on westbound 13th Street, from 11th Street/Bryant Street/Division Street to Folsom Street Bulb-outs on Irving Street between 19th and 25th Avenues Bulb-outs on Holloway Avenue Blue handicap parking spaces Comments can be made in person or by email […]

SFDPW Hearing on Installation of New Transit Shelters

|
Agenda Item of Note: Order No. 183122 To consider the intention of the Department of Public Works to issue permits to install clear channel outdoor transit shelters at the following locations: Permit INTERSECTION 14TS-0089 SB Van Ness Avenue NS O’Farrell Street 14TS-0090 WB Lombard Street NS Fillmore Street 14TS-0091 SB Folsom Street FS 14th Street […]

SF Planning Commission Hearing: Second Street Protected Bike Lanes

|
Agenda From SFBC: Safety improvements are on the horizon, running the full length of Second Street, from Market to King. They will include bicycle-specific signaling to help reduce car/bike conflicts at intersections. The project could widen sidewalks, improve streetscaping, and includes a protected bike lane. Second Street is one of South of Market’s most important bike routes, connecting the […]

SFMTA Engineering Public Hearing

|
Agenda Items of Note: ESTABLISH — NO PARKING ANY TIME ESTABLISH — SIDEWALK WIDENING 8th Street, east side, from 178 feet to 262 feet north of Mission Street (sidewalk widened from 10 to 15 feet, removes 11 metered spaces #15-41, 33 8th Street) ESTABLISH — ABILITY OF PERMITTED COMMUTER SHUTTLE BUS TO USE MUNI BUS […]