For every pedestrian and cyclist who's had your journey interrupted by an impassable mound of snow, we bring you this story from Boston. Earlier this month, Beantown resident Ari Goldberger found his journey to the Wellington Station T stop impeded by a "15-foot mountain of snow."
He registered his complaint to the powers that be, but he got the run-around.
“Rather than waiting on hold for a million years calling the MBTA, I posted the picture online and said, ‘If nothing is done about this, it’s going to take months to melt,'" he told BDC Wire.
So Goldberger and his friends took matters into their own hands, and after a long, beer-fueled digging session, tunneled their way through. Now people can use this route to bike or walk again, and the excavators are heroes. He's a look at what it's like to ride through it. Pretty awesome.
Update 2/23/15 1:27 p.m.: The tunnel was destroyed by an unknown entity late Saturday, according to Mashable. So this story has a sad ending after all.